AETEC
AETEC Smart CNC Automation Digital Twin
Testing Mode · Adaptive Device UI
Admin Online
1,248 pcs▲ 12.4% vs yesterday
86.7%▲ 4.7% vs yesterday
92.3%▲ 3.1% vs yesterday
93.1%▲ 5.8% vs yesterday
98.6%▲ 1.2% vs yesterday
2h 15m13.2% of available time
6 14Critical & warning
7 Active3 Production · 2 Tooling · 2 Inspection
98.6%Sampling pass rate
UTC+08:00   10:24:36   May 19, 2025
iPhone 3D ready · drag to rotate · pinch to zoom · blue / orange / purple lines show AMR flow
Selected Asset
Click a CNC, AMR, MC250, ToolBank, or worker in the 3D scene.
Workpiece Traceability Latest
Display window: latest 2 hours. Older records are stored in database export files.
Inspection Sampling Shift
200 / 240Target / Plan
83.3%Current shift
192 (96.0%)In tolerance
8 (4.0%)Review needed
  • Ø48.02
  • Ø28.01
  • Ø16.00
  • 45.01
IN TOLERANCE
Event Timeline Latest 2 hours
    All timeline history is retained in the demo database export.
    Route Control Auto Dispatch ON
    Production Tool-Service Inspection Idle
    Process Flow
    Raw Part Arrival
    AMR / Tray Delivery
    UR30 Machine Tending
    Machining
    In-Process Inspection
    ToolBank / Tool Change
    Finished Goods
    34 pcsWIP
    12 pcsIn Process
    1,084 pcsCompleted
    98.6%FPY
    Layer / Function Control
    Log retention: on-screen logs display the latest 2 hours. Full history is represented as database files below.
    Download Excel Database Download Event CSV